You are here: Home > Steel News > Latest Steel News > Chelyabinsk...

Chelyabinsk Metallurgical Plant meets ecological requirements with modernization

Friday, 23 February 2018 16:49:12 (GMT+3)   |   Istanbul

Russian mining and steel group Mechel has announced that its subsidiary Chelyabinsk Metallurgical Plant has modernized gas cleaners at two units of its oxygen converter workshop. The modernization will ensure the gas cleaners’ compliance with high ecological requirements.

Mechel stated that the repairs were made at the workshop’s steel processing unit and steel billet continuous caster, which have been equipped with a modern dust and gas cleaning complex and closed-cycle water supply that enable them to work with maximum filtering efficiency.

Anatoly Schetinin, managing director of Chelyabinsk Metallurgical Plant, stated that the oxygen converter workshop has undergone a major reconstruction over the past few years, nearly all key units were replaced, and the plant has put outdated units out of operation.


Similar articles

Mechel’s Beloretsk Metallurgical Plant to supply trial lots of new steel ropes

27 Jun | Steel News

Mechel’s Izhstal completes overhaul of bar and wire rolling mill 250

23 Jan | Steel News

Mechel’s Izhstal to receive loan from Eximbank of Russia to increase production

26 Dec | Steel News

Mechel’s Beloretsk Metallurgical Plant orders steel rope mill

24 Mar | Steel News

Mechel successfully tests new coal export terminal at Port Posiet

14 Feb | Steel News

Mechel’s new coke-oven battery triples output after reconstruction

21 Dec | Steel News

Mechel launches blooming concaster at Chelyabinsk Metallurgical Plant

19 Dec | Steel News

Mechel inks deals to build power facilities for Elga coal mining complex

30 Aug | Steel News

Mechel launches new production complex for high quality and stainless steels

26 Jul | Steel News

Evraz Group: Construction boom is the main engine of CIS steel industry

04 Jun | Steel Matters