You are here: Home > Steel News > Latest Steel News > Tosyalı...

Tosyalı Algerie begins production at second DRI facility

Wednesday, 25 September 2024 16:00:30 (GMT+3)   |   Istanbul

Steel producer Tosyalı Algerie, Algeria-based subsidiary of Turkish company Tosyalı Holding, has announced that it has commissioned and started commercial production at the direct reduced iron (DRI) facility within the scope of the four-phase flat steel complex investment in Bethioua, Oran. The facility, which has an annual production capacity of 2.5 million mt, can operate with both natural gas and hydrogen.

With its existing DRI facility with a capacity of 2.5 million mt, the company now has the largest direct reduced iron production capacity in Europe and North Africa.

The company started slab production at the flat product complex in May this year, as SteelOrbis previously reported, while the fourth phase of the investment is expected to be completed by 2025. When all phases of the investment are completed, Tosyalı Algerie will have an annual production capacity of 8.5 million mt of flat and long products.


Similar articles

Tosyalı Algerie exports first slab from Algeria

19 Aug | Steel News

Tosyali Algerie to collaborate with Sonatrach on hydrogen production

26 Jul | Steel News

Tosyalı Algerie commissions new flat steel facility, begins slab production

28 May | Steel News

Tosyali Algerie to build pickling and cold rolling facility

05 Apr | Steel News

Tosyalı Algerie orders coil coating line for flat steel plant

14 Mar | Steel News

Tosyali Algerie to conclude expansion project by 2025, first production in 2024

25 Dec | Steel News

Tosyalı Algerie wins natural gas pipe tender

16 Aug | Steel News

Tosyalı Algerie to build iron ore beneficiation plant

20 Apr | Steel News

N. African longs export prices rise amid better mood, regional uptrend

01 Mar | Longs and Billet

Tosyalı Algerie to commission flat steel complex in Oran from 2024

03 Jan | Steel News